Skip to content

RES Decree 2019

2019PolicyMitigationMore details
Sectors: Energy
The Ministerial Decree providing incentives to electricity production from renewable energy sources (The RES Decree) 2016 updates the allocation scheme of incentives to renewable energy other than photovoltaic. The scheme covers wind farms, hydro, biomass and biogas, CSP and other non-photovoltaic renewable energy sources for the year 2016. It maintains the structure of the previous incentive 2012-2015 regime, while decreasing the value of overall incentives available. As in the previous scheme, renewable energy plants may benefit from:
    • All-inclusive tariff, applicable to Plants with capacity up to 500kW; or
    • Feed-in tariff, applicable to Plants with capacity up to 500kW which do not opt for the above All-Inclusive Tariff, and Plants with nominal capacity greater than 500kW.
Incentives are granted either through registry procedure (plants with capacity below 5MW) or tender procedures (reverse auctions; plants with capacity above 5MW). The overall cap on incentives for RES plants remains at €5.8 billion per year. The 2019 decree updates the 2016 text to promote renewable energy production over the period 2019-2021.
Examples:
Resilient infrastructure, Fossil fuel divestment, Net zero growth plan, Sustainable fishing

Main document

RES Decree 2019
PDF

Timeline

Show

Note

CCLW national policies

The summary of this document was written by researchers at the Grantham Research Institute . If you want to use this summary, please check terms of use for citation and licensing of third party data.