Skip to content
  • Home
  • /
  • Search
  • /
  • China
  • /
  • 13th Geothermal Energy Development Five Year Plan (2016-2020)

13th Geothermal Energy Development Five Year Plan (2016-2020)

Geography
🇨🇳 China
Year
2017
Document Type
Policy

Documents

Each policy in our database can contain one or more documents.

Document
Topics
Main document
Plan
Mandarin Chinese (Original Language)
Energy supply mitigationRenewable energyEnergy supply sectorGeothermal energy+ 1 more

Summary

This Plan aims to develop 1.1 billion square metres of geothermal heating (and cooling) areas, reaching a total of 1.6 billion square metres, and increase 500 MW of installed geothermal capacity, reaching 530 MW in total. The key tasks include organising geothermal resource exploration; power generation programmes; technology research and development; information monitoring; and constructing an industrial service system. Major projects include hydrothermal geothermal heating; shallow geothermal energy utilisation; medium and high temperature geothermal power generation; and hot dry rock power generation.


 Topics mentioned most in this policy

See how often Topics get mentioned in this policy and view specific passages of text highlighted in each document.

Group
Topics
Renewable energy
Economic sector

Note

Grantham Research Institute

The summary of this document was written by researchers at the Grantham Research Institute . If you want to use this summary, please check terms of use for citation and licensing of third party data.