Under the Ministry of Industry and Trade's Decision 21 dated January 7, 2023 that came into force the same day, the maximum purchase price for "transitional" solar power projects is now VND1,185-1,508 (5.0-6.4 U.S. cents) per kWh, depending on the type and excluding VAT.
Decision 21/QD-BCT 2023 on Transitional Power Generation Price Framework For Solar And Wind Power Plant
Documents
Each policy in our database can contain one or more documents.
Document
Topics
Main document
Decision
Vietnamese (Original Language)
Energy supply mitigationRenewable energyWind energyEnergy supply sector+ 2 more
Main document
Decision
English (Translation)
Energy supply mitigationRenewable energyWind energyMedia sector+ 5 more
Summary
Topics mentioned most in this policy
See how often Topics get mentioned in this policy and view specific passages of text highlighted in each document.
Group
Topics
Policy instrument
Climate justice
Renewable energy
Economic sector
Finance
Note
This entry and summary were provided by the Climate Policy Database. If you want to use the summary, please see the terms of use for citation and licensing of third party data.