Skip to content

General Scheme for the Placement of Electric Power Facilities in the Russian Federation up to 2042

Geography
🇷🇺 Russian Federation
Year
2024
Document Type
Policy

Documents

Each policy in our database can contain one or more documents.

Document
Topics
Energy supply mitigationRenewable energyConstruction sectorEnergy supply sector+ 15 more

Summary

This strategy establishes the strategic framework for the development of power generation capacity and grid infrastructure from 2031 to 2042, focus on future electricity demand and system adequacy. According to the plans, fossil fuels will account for around 57% of electricity generation, nuclear power 24% (up from 18% in 2024), hydropower 15%, and wind and solar 3%.

 Topics mentioned most in this policy

See how often Topics get mentioned in this policy and view specific passages of text highlighted in each document.

Group
Topics
Target
Policy instrument
Climate justice
Renewable energy
Fossil fuel
Greenhouse gas
Economic sector
Finance

Note

NewClimate Institute

This entry and summary were provided by the Climate Policy Database. If you want to use the summary, please see the terms of use for citation and licensing of third party data.