These Guidelines outline the bidding and contracting processes for solar PV power projects. The reason for these Guidelines is that the procurement of electricity through competitive bidding by the distribution licensees is expected to reduce the overall cost of procurement of power and facilitate the development of power markets.
Other objectives for these to provide a transparent, fair, standardised procurement framework based on open competitive bidding with appropriate risk-sharing between various stakeholders to enable procurement of power at competitive prices in consumer interest, improve bankability of projects and ensure reasonable returns to the investors; and to provide for a framework for the inter-state/ intra-state, long-term, sale-purchase of power as a further measure to de-risk the sector.
The Power Purchase Agreement (PPA) is expected to be signed within 140 days from the release of the bid (i.e., the zero date), while the bid submission is to be made within 22 days of the zero date. The PPA between the RE Project and Procurer/Intermediate procurer shall clearly indicate the scheduled commencement-of-supply date (SCSD) and the quantum of supply.
Through Memorandum F. No. 283/48/2018 dated 14 September 2022, part-commissioning of ISTS connected solar projects in lots of 10MW was allowed from 14 September 2022 to 31 March 2023 to facilitate expeditious commissioning of solar PV power projects.