TheIndicative Expansion Plan of the Generation System 2020-2050, developed by the Ministry of Energy and Mines through its Unidad de Planeación Energético Minera, establishes the long-term vision for Guatemala’s electricity generation system, ensuring national energy security while advancing the objectives of the national legal and policy framework. Structured in two parts, the plan first analyses the socio-economic, macroeconomic, hydrological, and emissions context of the energy sector, and then projects demand growth, resource availability, and investment requirements under ten modelled scenarios up to 2050. From a total of 60 candidate plants (2758 MW) considered—of which over 80 per cent rely on renewable resources—the scenarios assess expansion costs ($4.8–6.8 billion), the role of fossil and renewable sources, and the impact on diversification, system reliability, and greenhouse gas emissions.
The plan concludes that existing capacity is sufficient to cover demand until 2030, yet highlights the need to periodically reassess hydrological models and climate impacts. Opportunities for renewable development emerge across successive periods: geothermal, hydroelectric and biogas (2020–2025); solar (2024–2027); and wind (2027–2035). Key objectives include diversifying the generation matrix, prioritising renewable technologies with firm capacity, gradually substituting fossil fuels through geothermal and natural gas opportunities, and ensuring transmission infrastructure to integrate new capacity. A further emphasis is placed on expanding generation in high-demand areas or those with future growth potential to stimulate economic development and job creation. Recommendations highlight the importance of regional interconnections (notably with Mexico), state or public-private investment in geothermal and solar projects, and continuous monitoring of demand scenarios, particularly in the context of energy-intensive industries and dry-season hydrological variability