In July 2020, a METI committee was set up to formulate a plan to install 10 GW of offshore wind power capacity by 2030, compared to the current total installed capacity of 65 MW. It would lead to an additional renewable electricity generation of about 26 TWh/year or 2.5% of total electricity generation in 2030 (assuming a 30% capacity factor).
Mid-term deployment plan for offshore wind power
Documents
Each policy in our database can contain one or more documents.
Document
Topics
Public sectorDistributive justiceEnergy supply mitigationFossil fuel+ 41 more
Summary
Topics mentioned most in this policy
See how often Topics get mentioned in this policy and view specific passages of text highlighted in each document.
Group
Topics
Target
Policy instrument
Risk
Just transition
Climate justice
Renewable energy
Fossil fuel
Greenhouse gas
Economic sector
Adaptation/resilience
Finance
Note
This entry and summary were provided by the Climate Policy Database. If you want to use the summary, please see the terms of use for citation and licensing of third party data.