Skip to content
  • Home
  • /
  • Search
  • /
  • India
  • /
  • Order re Renewable Purchase Obligation (RPO) and Energy Storage Obligation Trajectory till 2029-2030

Order re Renewable Purchase Obligation (RPO) and Energy Storage Obligation Trajectory till 2029-2030

Geography
🇮🇳 India
Year
2022
Document Type
Policy

Documents

Each policy in our database can contain one or more documents.

Document
Topics
Energy supply mitigationRenewable energyEnergy storageEnergy supply sector+ 6 more
Main document
Order
English (Original Language)
Energy supply mitigationRenewable energyEnergy storageEnergy supply sector+ 6 more

Summary

This Order F. No. 09/13/2021-RCM made by the Ministry of Power stipulates the Renewable Purchase Obligations (RPO) for various renewable energy sources. For instance, in the year 2029-30, the wind RPO is 6.94% of total electricity consumption, the hydro power RPO (HPO) is 2.82%, and the other RPO is 33.57%, constituting a total RPO of 43.33%. The Order stipulates a capping price for renewable energy certificates for hydro power with an annual escalation, and hydro power imported from outside India does not meet the HPO.


There are also stipulations for the amount of storage as a percentage of the total energy consumed for solar/wind energy.


Corrigendum F. No. 09/13/2021-RCM was made on 19 September 2022 to recognise the significant amount of investment for wind power projects compared to other renewable energy technologies, benefitting states that have invested in wind power by considering the inclusion of wind energy, where it was above 7% of total energy consumption and consumed before 31 March 2022, in the RPO.

 Topics mentioned most in this policy

See how often Topics get mentioned in this policy and view specific passages of text highlighted in each document.

Group
Topics
Policy instrument
Just transition
Renewable energy
Economic sector
Finance

Note

Grantham Research Institute

The summary of this document was written by researchers at the Grantham Research Institute . If you want to use this summary, please check terms of use for citation and licensing of third party data.